ThermoCoolHubHVAC, refrigeration, cold chain, compressors, heat pumps, and ventilation equipment for global industrial buyers.
Standing Water Dispenser Compressor Cooling with Refrigerator Cabinet with Child Lock Hot Cold Norma
Controls Sensors And Installation Parts

Standing Water Dispenser Compressor Cooling with | RFQ Sourcing Details

Controls Sensors And Installation Parts · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryControls Sensors and Installation Parts
Unitset
CategoryControls Sensors And Installation Parts
AvailabilityInquiry required
Source date2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Controls Sensors And Installation Parts. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Model Function 2301 Electronic cooling with cabinet 2301C Compressor cooling with cabinet 2301R Compressor cooling with Refrigerator Main Spec. Rated voltage: 220-240V~ 50/60. Hz Heating power:500-550W,Cooling power: 65-85W 1. Cold,Normal and hot water(3 Taps,Hot with child-lock) 2.

New compressor cooling(R134a cooling gas) 3. Stainless steel welded hot and cold water tank 4. Hot water 5L/H( ≥90 ºC ),Cold water 2L/H( ≤10 ºC ) 5. Brown carton package 6. The Plastic Parts are ABS materials 7.

With E.U 2pin(VDE) plug Packing Details Product size: 310x325x950mm Carton size: 325x325x990mm Loading/40'HQ 490pcs,(if lay in top of container, 630pcs) FA er dispenser, it is recommended to clean it at least once a month. Q2: How to clean the water dispenser?

When cleaning the water dispenser, follow the following steps: Disconnect the power supply and drain the water from the water tank. Wipe the outside of the water dispenser with a gentle cleaner and a soft cloth. For the tank, it can be cleaned with food grade disinfectant and then thoroughly washed with water.

Q3: Is it normal for the water dispenser to heat the water? Minor noise is normal during heating because the heating element is working. But if the noise is too high or continuous, it is recommended to . Q4: How is the hot water temperature of the water dispenser is not hot enough?

If the hot water temperature is not hot enough, it may be due to the following reasons: the power supply voltage is unstable. Failure of the heating element. Water quality problems affect the heating efficiency. Set the temperature is too low. Please check these factors, and if the problem persists, please .

Q5: What if the cold water function of the water dispenser does not work? The cold water function may not work due to the power is not connected or unstable. The refrigeration system fails. Cold water function was not activated.

Please check the power supply and setting, if the problem remains, please consult the after-sales service. Q6: What is the smell when the water dispenser is used? Early in use, the water dispenser may have some plastic or a new machine smell. This usually disappears after a few uses. If the odor persists, it may b

Standing | Applications and Buyer Notes

Standing is organized as a sourcing-ready Controls Sensors And Installation Parts reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirement

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Controls Sensors and Installation PartsBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryControls Sensors and Installation Parts
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

ThermoCoolHub related sourcing paths

Related applications ThermoCoolHub related paths

Food Refrigeration Projects

Cold Chain Storage

Related solutions ThermoCoolHub related paths

Refrigeration Parts Replacement

Cold Room Equipment Sourcing

ThermoCoolHub procurement phrases

ThermoCoolHub related product samples