ThermoCoolHubHVAC, refrigeration, cold chain, compressors, heat pumps, and ventilation equipment for global industrial buyers.
Refrigeration System Air Cooled Condensing Unit for Cold Room Outdoor
Port And Wharf Equipment

Refrigeration System Air Cooled Condensing Unit for Cold Room Outdoor

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Quote on request

Refrigeration | Applications and Buyer Notes

Refrigeration is organized as a sourcing-ready Port And Wharf Equipment reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Vertical Site
hvacrefrigerationsupplyBased on visible page data; confirm exact value in the RFQ.
Category
Commercial RefrigerationBased on visible page data; confirm exact value in the RFQ.
Source Domain
ouyucool.en.made-in-china.comBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Air Flow(m 3 /h)
1×5100 1×5110 2×3900 2×3900 2×3900 2×3900Based on visible page data; confirm exact value in the RFQ.
Application
refrigeration, cold, roomBased on visible page data; confirm exact value in the RFQ.
Certification
RoHS, ISO, CE, CCCBased on visible page data; confirm exact value in the RFQ.
Compressor
Model ZSI06KQE-TFP ZSI09KQE-TFP ZSI14KQE-TFP ZSI15KQE-TFP ZSI18KQE-TFP ZSI21KQE-Based on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Product sourcing profile

CategoryPort And Wharf Equipment
Inquiry workflowPlatform RFQ workflow
AvailabilityInquiry required
Updated2026-05-04

Product introduction

Home Industrial Equipment & Components Refrigeration Equipment Condenser Refrigeration System Air Cooled Condensing Unit for Cold Room Outdoor US$680.00-1,707.00 1 Piece-led product discovery for buyers looking for commercial refrigeration options. The page is organized around specification review, application fit, and inquiry-ready comparison.When evaluating this product, buyers should confirm application fit, required performance range, installation environment, lead time, documentation, and whether the supplier can support OEM or project quotations. Current vertical focus: hvac, refrigeration, cold chain, compressors, heat pumps, and ventilation equipment sourcing and rfq-ready export supply platform.refrigerationcoldroomair

Selection and RFQ points

Review material fit, application context, alternatives and RFQ detail before comparing related product paths.

Material fit Port Wharf Equipment

Confirm material, size, finish, tolerance and processing needs before price comparison.

Application fit application, operating environment and usage frequency

Add the target application and operating context so related products can be compared correctly.

Alternative path Home Industrial Equipment & Components

Use nearby materials, equipment types or category pages when this record is close but not exact.

RFQ detail Quantity, destination, timing

Include quantity, destination, target delivery window, packaging and any technical constraints.

Key specifications

Vertical Sitehvacrefrigerationsupply
CategoryCommercial Refrigeration
Source Domainouyucool.en.made-in-china.com
Brand
Unitset
Air Flow(m 3 /h)1×5100 1×5110 2×3900 2×3900 2×3900 2×3900
Applicationrefrigeration, cold, room
CategoryCommercial Refrigeration
CertificationRoHS, ISO, CE, CCC
CompressorModel ZSI06KQE-TFP ZSI09KQE-TFP ZSI14KQE-TFP ZSI15KQE-TFP ZSI18KQE-TFP ZSI21KQE-TFP
Condensation FormsAir-Cooled
CondenserFan Diameter(mm)
Condensing Unit TypeSemi-Hermetic Compressor or Closed Type
ConditionNew
Cooling Capacity (w)Evap-5ºC
Cooling TypeAir Cooled Condensing
CustomizationAvailable
Discharge (inch)3/8" 1/2"
Fan voltage220V/1P/50HZ
Feature Highlightsdigital
FormFixed Tube-Sheet
ManufactoryManufactory
Matched Termsrefrigeration, cold, room, air
MaterialCopper
ModelUCG02MZB UCG03MZB UCG04MZB UCG05MZB UCG06MZB UCG07MZB
Model NO.Air Cooled Condenser
OriginChina
Overall Dimension L×W×H (mm)1270×560×690 1270×560×990
PipeSuction (inch) 3/4" 7/8"
Power20 hp
Power of Fan(W)1×250 1×250 2×180 2×180 2×180 2×180
Product TitleRefrigeration System Air Cooled Condensing Unit for Cold Room Outdoor
RefrigerantR404A
Room Temperature( ºC )30ºC ~ 0ºC
SpecificationAs cusotmer's requirement
Specification TypeCustomized
Structural FormVertical
TrademarkOEM or OUYU
Transport PackageCTN Package
US$680.00-1,707.001 Piece (MOQ)
Unit TypeOpen Type,Box Type
Voltage220v

Keyword evidence

Only terms with visible evidence in this listing are shown here.

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Related keyword paths

Grouped by the product keyword that generated the related path.

SOURCING DECISION BRIEF

Refrigeration System Air Cooled Condensing Unit for Cold Room Outdoor sourcing decision brief

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Category
Commercial Refrigeration
Price status
Quote on request
Inquiry model
Structured product RFQ with quantity, destination and technical requirements.
Availability
Confirm by inquiry
Sourcing lens
Product detail to shortlist decision
Primary compare
Vertical Site, Category, Source Domain
Record focus
Refrigeration System Air Cooled Condensing Unit For Cold Room Outdoor
Category focus
Port And Wharf Equipment
Buyer checklist
  • Category fit: Confirm whether the product belongs to the right category and nearby application path before outreach.
  • Specification depth: Review the visible specifications and convert missing fields into a clearer RFQ requirement set.
  • Route expansion: Use adjacent category, solution and procurement routes before settling on one detail page.
How should buyers use this detail page?

Use the detail page as a product-fit checkpoint. Confirm category placement, visible specifications and adjacent sourcing paths before sending an RFQ.

What should buyers compare first?

Compare the visible specifications, category fit and the nearest application or solution routes before asking for supplier options.

ThermoCoolHub related sourcing paths

ThermoCoolHub procurement phrases

ThermoCoolHub project-fit checks

Application Confirm Application before comparing offers or moving the inquiry forward.
Country Confirm Country before comparing offers or moving the inquiry forward.
Capacity Confirm Capacity before comparing offers or moving the inquiry forward.
Material Confirm Material before comparing offers or moving the inquiry forward.
Application route Use Application to compare adjacent options instead of relying on one broad title match.
Country route Use Country to compare adjacent options instead of relying on one broad title match.

ThermoCoolHub related product samples

Procurement notes

If visible specifications are still thin, add model, material, interface, quantity, application fit, destination and target lead time before comparing quotes.

Next sourcing actions