ThermoCoolHubHVAC, refrigeration, cold chain, compressors, heat pumps, and ventilation equipment for global industrial buyers.
Astoria Coffee Machine Koffiemachine Italian Espresso Coffee Maker
Controls Sensors And Installation Parts

Astoria Coffee Machine Koffiemachine Italian Espr | RFQ Sourcing Details

Controls Sensors And Installation Parts · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryControls Sensors and Installation Parts
BrandWuxi SWF In
Unitset
CategoryControls Sensors And Installation Parts
AvailabilityInquiry required
Source date2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Controls Sensors And Installation Parts. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Parameter SWF MINI Double - Head Dual - Boiler Version SWF MINI Double - Head Triple - Boiler Version Water Pump Commercial Rotary Pump Commercial Rotary Pump Number of Boilers Dual Boilers Triple Boilers Boiler Material Food - grade Stainless Steel Food - grade Stainless Steel Boiler Size Steam: 10 liters, Extraction: 3.5 liters Steam: 10 liters, Extraction: 1.5 liters + 1.5 liters Brew Head Structure Saturated Brew Head Saturated Brew Head Temperature Control Method Dual PID, Steam and Extraction Temperature Adjustable 3 PID, Independent Temperature Adjustment for Steam and Two Extraction Boilers Display Dual - temperature Display Tri - temperature Display Extraction Metering Commercial Five - button Flow Metering Commercial Five - button Flow Metering Manual Brewing Three - stage Manual Brewing Three - stage Manual Brewing Water Source Support Supports Connecting to Water Source Supports Connecting to Water Source Pre - brewing Manual or Electronic Automatic Manual or Electronic Automatic Steam Nozzle 4 Holes to Meet Commercial Use 4 Holes to Meet Commercial Use Warm - up Time 10 - minute Quick Pre - heating System 10 - minute Quick Pre - heating System Core Components Water Pump FLUID, Solenoid Valve ODE Water Pump FLUID, Solenoid Valve ODE Power 3500W 5000W The SWF-MINI-2 Italian 2 Group Dual Boiler Professional Commercial Expresso Espresso Coffee Machine for Business SWF-MINI-2 coffee machine offers by default what the industry has long considered "optional" - temperature stability Designed with the needs of the modern specialty coffee shop in mind, SWF-MINI-2 is made for coffee people, by coffee people.

SWF-MINI-2 is our full value machine and comes with a very high specification for its class. With Independent Saturated Boilers, no steam valve reconstruction and easy-to-program volumetric output, it's the standard for professional espresso coffee machines.

Independent Saturated Boilers Separate saturated boilers for each group head allow barista to optimize temperature for individual coffees, ensuring thermal stability. Proportional Steam Valve Lever-style activation for proportional solenoid steam valve.

PID Temperature Control Set independent temperatures for each grouphead and ste

Astoria | Applications and Buyer Notes

Astoria is organized as a sourcing-ready Controls Sensors And Installation Parts reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Controls Sensors and Installation PartsBased on visible page data; confirm exact value in the RFQ.
Brand
Wuxi SWF InBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryControls Sensors and Installation Parts
BrandWuxi SWF In
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

ThermoCoolHub related sourcing paths

Related applications ThermoCoolHub related paths

Commercial Building HVAC

Food Refrigeration Projects

Related solutions ThermoCoolHub related paths

Refrigeration Parts Replacement

ThermoCoolHub procurement phrases

ThermoCoolHub related product samples